In June, the Krško nuclear power plant produced 520,374.44 MWh of gross electricity at the output of the generator, or it sent 495,359.39 MWh of electricity to the power grid.
In this month, production was 1.09% higher than planned (490,000 MWh), the availability factor was 100%. The power plant operated within the limits of technical specifications, all safety systems were able to function.