November 22, 2024
Owner's Engineer banner
HomeSEE Energy NewsPlant engineering, design, permiting, construction, commissioning, operation, role of OE

Plant engineering, design, permiting, construction, commissioning, operation, role of OE

Supported byClarion Energy banner

Plant engineering is a complex discipline encompassing various activities throughout the project lifecycle—from conceptual design and feasibility studies to construction, commissioning and operation. The Owner’s Engineer (OE) plays a pivotal role in ensuring each phase is executed efficiently, meeting the project’s technical, financial and regulatory requirements. Below, we elaborate on the key phases in plant engineering and the critical contributions of the OE.

1. Project conceptualization and feasibility study

In the initial phase, the focus is on evaluating the project’s viability and establishing a high-level project plan.

  • Activities:
    • Conduct feasibility studies, including technical, economic and environmental assessments.
    • Define project objectives, requirements and scope.
    • Evaluate site location and its suitability for the proposed plant.
    • Assess regulatory and permitting requirements.
    • Perform initial risk assessments and identify mitigation strategies.
  • OE role:
    • Technical advisory: The OE provides insights on technology selection, plant capacity and site suitability.
    • Feasibility analysis: Reviews feasibility studies, validating technical and financial assumptions.
    • Preliminary design evaluation: Ensures preliminary designs align with the owner’s requirements and industry standards.
    • Regulatory support: Assists in understanding regulatory requirements and preparing necessary documentation.

2. Front-end engineering design (FEED)

FEED transitions the project from concept to a detailed technical and budgetary framework.

Supported byHerran banner
  • Activities:
    • Develop process flow diagrams (PFDs) and piping and instrumentation diagrams (P&IDs).
    • Establish basic engineering design and equipment specifications.
    • Prepare cost estimates and budget forecasts.
    • Define project execution plans and procurement strategies.
    • Conduct risk assessments and develop HAZOP reports.
  • OE role:
    • Design review: Reviews FEED deliverables for technical accuracy and completeness.
    • Cost and schedule evaluation: Provides independent evaluations of cost estimates and schedules.
    • Risk analysis: Participates in HAZOP and risk assessments, ensuring potential risks are managed.
    • Interface coordination: Manages interfaces among engineering disciplines for seamless integration.

3. Detailed engineering design

This phase finalizes all aspects of the plant’s design, producing construction-ready documents.

  • Activities:
    • Develop detailed engineering drawings and specifications.
    • Finalize equipment lists and procurement packages.
    • Prepare structural, mechanical, electrical, and instrumentation designs.
    • Establish construction plans and address design issues.
  • OE Role:
    • Design Oversight: Reviews and approves detailed designs for compliance with requirements.
    • Procurement Support: Ensures technical specifications meet project criteria.
    • Change Management: Evaluates the impact of design changes on cost and schedule.
    • Quality Assurance: Ensures adherence to quality standards through design reviews.

4. Procurement and Contracting

This phase involves sourcing essential equipment, materials and services.

  • Activities:
    • Prepare procurement documents and technical specifications.
    • Evaluate bids and negotiate contracts with suppliers and contractors.
    • Monitor and expedite delivery of critical materials.
  • OE role:
    • Bid evaluation: Reviews technical bids and recommends suppliers based on compliance and quality.
    • Contract negotiation support: Assists in negotiating favorable contract terms.
    • Vendor audits: Conducts audits to ensure suppliers can meet project specifications.

5. Construction and Installation

This phase covers the physical construction and preparation for commissioning.

  • Activities:
    • Execute site preparation, civil works and infrastructure development.
    • Install mechanical, electrical and instrumentation systems.
    • Conduct on-site testing and quality assurance.
  • OE role:
    • Construction supervision: Ensures construction adheres to designs and safety standards.
    • QA/QC management: Implements quality assurance procedures and conducts inspections.
    • Progress monitoring: Tracks construction progress and addresses potential delays.
    • Safety compliance: Ensures adherence to safety and environmental protocols.

6. Commissioning and startup

Commissioning involves testing systems and ensuring they function as intended.

  • Activities:
    • Develop and implement commissioning plans.
    • Perform functional tests and system integrations.
    • Train personnel on operational procedures.
  • OE role:
    • Commissioning oversight: Supervises commissioning activities for compliance with procedures.
    • Performance validation: Confirms that the plant meets operational requirements.
    • Deficiency management: Tracks and addresses deficiencies before final acceptance.

7. Handover and operation

This phase marks the transition to full operation by the owner.

  • Activities:
    • Conduct final inspections and clear any deficiencies.
    • Transfer project documentation, including operation manuals and as-built drawings.
    • Facilitate the final handover and acceptance.
  • OE role:
    • Documentation and training: Ensures completeness of documentation and adequate training for the owner’s team.
    • Final acceptance: Conducts inspections to confirm readiness for operation.
    • Support during defects liability period: Addresses any post-handover issues.

8. Operation and maintenance support

Although often informal, many OEs continue to provide support during early operation.

  • Activities:
    • Offer technical support and troubleshooting.
    • Assist with optimization and maintenance strategies.
  • OE role:
    • Optimization support: Helps optimize plant performance and resolve operational challenges.
    • Ongoing training: Facilitates knowledge transfer to the owner’s team.

Conclusion

The Owner’s Engineer is essential throughout the plant engineering lifecycle, acting as an independent advisor, technical expert and project manager. Their involvement ensures that projects are executed according to the owner’s requirements, within budget and on schedule, while maintaining the highest standards of quality, safety and performance.

Elevated by
www.owners.engineer

Supported byElevatePR Digital banner

RELATED ARTICLES

Supported byOwner's Engineer
Supported by
Supported byClarion Energy
Supported by
error: Content is protected !!