HPP Visegrad was commissioned in 1989 and it has power output of 315 MW (3 x 105 MW) and average annual generation of 1,010 GWh of electricity. Total electricity production of the plant stood at 23,883.26 GWh at the end of 2015. Record annual production was achieved in 2010 with 1,283.05 GWh.